The Aux Sable Liquid Products Inc. is going to do an inspection dig on their 8” pipeline located on the west side of Golden Oak Drive, between Oakwood Drive and Mulranny Drive, on ComEd right of way. Weather permitting, the dig will start on Tuesday, February 28, lasting for a minimum of two (2) days.
It is anticipated that Golden Oak Drive will be open to traffic during the inspection dig operation. The sidewalk along the west side of Golden Oak will be closed for pedestrian traffic. Advance warning signs will be posted. The approximate location of the 8” pipeline is north of the Heroes Trail pathway, and the trail will be open for use.